Page 9 - Combined_81_OCR
        P. 9
     ENGINE COOLING WIND TUNNEL                                                                   6.
                                                                                                   I
                   PROPOSED WIND TUNNEL (Continued)
               e
                   Uti1i ties (Continued)
                  Water, air, and oil fuel supplies shall be connected into the
                   Impact Building systems.
                   Indolene (standard Tab. gasoline) supply to test cars shall be
                   from a new tank to be situated outside the security fence east
                  of the Impact Building.
                  Site                                                  ;                          ’
                  The size of the- site is expected to be approximately 200' X 250
                  Access to the site shall be by roadway south of Impact Building
                  Parking shal1 be provided for eight cars on the north side of
                  the    1  oadway.    The Wind Tunnel shall be south of the roadway
                  and set back approximately 85'.
                  The area between the Wind Tunnel and the roadway and for a
                  distance of approximately 20* around the Wind Tunnel shall be
                  graded and landscaped.
                  Wind Tunnel Layout
                                                                                                           . f
                  The entrance of the Wind Tunnel shall be by pedestrian door
                  off the driveway, leading directly into the support area.
                  Access to the office, washroom and storage space shall be
                  from the support area.
                  The office shall hold three desks and associated office equip
                  ment and shall be air conditioned. The washroom facilities
                  shall be available for men only.